Documentation

Q2Presentation.Induction.TargetKmodRRoute58ProjectionActionProofs

Route58 target K/R projection/action refinement #

Route57 leaves one coherent target-side Section 8 residual:

This sidecar keeps the active integration untouched and refines that residual into smaller packets matching the manuscript tower

Y -> B = Y/R -> C = Y/K, with M = K/R.

The split is deliberately not routed back through the older Route39/Route41/ Route26 selected-representative leaves, nor through the same-tower lower-level residual names. It records:

These three packets reassemble theorem-level into Route57's coherent projection/action data and into the Route57-compatible decoration providers.

Route58 residual split #

Route58 lower target map packet.

Manuscript anchor: §7, eq:targettower, where the lower target in the central-cover recursion is C = Y/K. This packet provides the concrete map Y -> B.C and surjectivity, but does not include the kernel or action law.

Instances For

    Route58 kernel packet for the lower target map.

    This is the exactness part of Y -> C = Y/K in eq:targettower, tied dependently to the selected lower target map.

    Instances For

      Route58 projected action packet for the selected lower target map.

      This is the §8 action compatibility used by exact-image lower maps: after the selected identification K/R ~= M, the C-action on M is actual ambient right conjugation on the quotient K/R.

      Instances For

        Reassembly into Route57 and transport-final surfaces #

        Reassemble Route57's coherent projection/action packet from the Route58 map, kernel, and action packets.

        Equations
        • One or more equations did not get rendered due to their size.
        Instances For

          Route57-compatible providers without the Route57 axiom #

          Route58 decoration-kernel provider, with the same shape as the active Route57 hook but a strictly smaller axiom closure.